78 N Main St
Ste. Genevieve, MO 63670
Routine Inspection
Inspection Date: October 1, 2025
Violations:
- Leak around the base of the shower in Room #5 has been fixed.
- Water main backflow device was inspected on 7/08/2025.
- Battery in emergency light by common area floor #2 has been replaced.
- Smoke alarm battery back up has been replaced in Room #6.
- T & P value on Carriage House hot water heater has been replaced.
Inspection Date: June 10, 2025
Violations:
- Caulk around the base of the shower in room #5 to prevent leaking.
- Emergency light above common area on floor #2 needs a new battery.
- Have the main back flow on the building water connection tested annually & maintain records.
- Replace the battery in room#6 smoke alarm.
- Replace the T & P value on Carriage House hot water heater.
Corrected on: October 1, 2025
Inspection: July 10, 2024 No Violations today!!
Inspection: June 29, 2023 -Replace the T & P value on Carriage House hot water heater.
Fixed: August 28, 2023 – T & P relief value has been replaced on the Carriage House hot water heater.