78 N Main St

Ste. Genevieve, MO 63670

Routine Inspection

Inspection Date: October 1, 2025

Violations:

  • Leak around the base of the shower in Room #5 has been fixed.
  • Water main backflow device was inspected on 7/08/2025.
  • Battery in emergency light by common area floor #2 has been replaced.
  • Smoke alarm battery back up has been replaced in Room #6.
  • T & P value on Carriage House hot water heater has been replaced.

Inspection Date: June 10, 2025

Violations:

  • Caulk around the base of the shower in room #5 to prevent leaking.
  • Emergency light above common area on floor #2 needs a new battery.
  • Have the main back flow on the building water connection tested annually & maintain records.
  • Replace the battery in room#6 smoke alarm.
  • Replace the T & P value on Carriage House hot water heater.

Corrected on: October 1, 2025

Inspection: July 10, 2024 No Violations today!!

Inspection: June 29, 2023 -Replace the T & P value on Carriage House hot water heater.

Fixed: August 28, 2023 – T & P relief value has been replaced on the Carriage House hot water heater.